Brief Description of Works
District
Bijnor
Scheme ID
4597326
Scheme Name
Kamala GOV QPV Scheme
Village Covered
3
Original Scheme Year
2014
Amount (Lakh)
219.25
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
1
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
1819
Pipe Line (Replacement)
302
FHTC Existing
490
FHTC Repair
140
FHTC New
387
Status
Specific reason for increasing cost
1.5. Since schemes are more then 10 years old and the water level is getting decreased in the tubewells , it has been observed that the condition of the tubewells is deteriorating day by day. Considering this situation, necessasry provisions have been made for the repair of existing tubewells, and in some locations, new tubewells have also been proposed.
2.During the site visit, it was observed that the existing pipeline in the Gram Panchayat has multiple leakages and is severely damaged at several locations due to multiple reasons . As a result, water supply is not reaching some areas. Taking these conditions into account, the new design has been prepared accordingly.
