Brief Description of Works

District Budaun
Scheme ID 4753482
Scheme Name RIJAULA
Village Covered 1
Original Scheme Year 2013
Amount (Lakh) 514.67
Retrofitting Year 2020
Amount (Lakh) 84.81
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Yes
Pump House (New) 1
Pump House (Repair) 1
Pipe Line (New) 3300
Pipe Line (Replacement) 12000
FHTC Existing 2120
FHTC Repair 798
FHTC New 1936
Status Partially Functional > 70 lacs
Specific reason for increasing cost Scheme covers 16 majras, all of them are scattered in approx 18 km radius. It consist 2 nos of T.W out of which one no of tube well is not in functional state and other one needs development. In this scheme 51.50 km pipeline was laid previously out of which 12 km pipeline is damaged, which needs to be replaced and 3.3 km pipeline extension is required. 1569 new FHTCs and 798 FHTCs are proposed for repairing.Scheme covers 16 majras, all of them are scattered in approx 18 km radius. It consist 2 nos of T.W out of which one no of tube well is not in fuctional and other one needs development. In this scheme 51.50 km piepeline was laid previously out of which 12 km pipeline is damaged, which needs to be replaced and 3.3 km pipeline extension is required. 1569 new/replaced pipeline FHTCs and 895