Brief Description of Works

District Unnao
Scheme ID 4827483
Scheme Name Akabarpur Water Supply Scheme
Village Covered 1
Original Scheme Year 2014
Amount (Lakh) 199.00
Retrofitting Year 2020
Amount (Lakh) 30.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. 7.35 lac (Plaster & painting, Repairing of wicket gate)
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 2653
Pipe Line (Replacement) 7630
FHTC Existing 527
FHTC Repair 241
FHTC New 298
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 12.79 km with respect to the requirement of 23.07 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 1.68 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 527 with respect to the required 825 House hold as per the present OMIL survey out of 527 FHTC, 241 FHTC are damaged condition need to repair. also, no of 298 new HSC is required to the fully functional. 4. 2011 census population 3075 at present for year 2025 is 4100.