Brief Description of Works
District
Unnao
Scheme ID
4827483
Scheme Name
Akabarpur Water Supply Scheme
Village Covered
1
Original Scheme Year
2014
Amount (Lakh)
199.00
Retrofitting Year
2020
Amount (Lakh)
30.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
7.35 lac (Plaster & painting, Repairing of wicket gate)
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
2653
Pipe Line (Replacement)
7630
FHTC Existing
527
FHTC Repair
241
FHTC New
298
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 12.79 km with respect to the requirement of 23.07 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 1.68 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 527 with respect to the required 825 House hold as per the present OMIL survey out of 527 FHTC, 241 FHTC are damaged condition need to repair. also, no of 298 new HSC is required to the fully functional.
4. 2011 census population 3075 at present for year 2025 is 4100.