Brief Description of Works

District Unnao
Scheme ID 4827490
Scheme Name GULRIHA WSS
Village Covered 1
Original Scheme Year 2014
Amount (Lakh) 662.56
Retrofitting Year 2020
Amount (Lakh) 184.97
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 2
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 3
Pipe Line (New) 6581
Pipe Line (Replacement) 4857
FHTC Existing 1502
FHTC Repair 1005
FHTC New 433
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 31.07 km with respect to the requirement of 11.43 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 2.18 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 1502 with respect to the required 1935 Household as per the present OMIL survey out of 1935 FHTC, 1005 FHTC are damaged condition need to repair. also, no of 433 new HSC is required to the fully functional. And two no Tubewell