Brief Description of Works

District Unnao
Scheme ID 4827505
Scheme Name PARA WSS
Village Covered 1
Original Scheme Year 2013
Amount (Lakh) 319.85
Retrofitting Year 2020
Amount (Lakh) 118.62
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 14063
Pipe Line (Replacement) 3167
FHTC Existing 405
FHTC Repair 305
FHTC New 623
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 25.89 km with respect to the requirement of 39.96 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 4.63 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 405 with respect to the required 1008 Household as per the present OMIL survey out of 1008 FHTC, 305 FHTC are damaged condition need to repair. also, no of 623 new HSC is required to the fully functional. And two no Tubewell 4. One OHT Zone and 13 habitations