Brief Description of Works
District
Unnao
Scheme ID
4827510
Scheme Name
ROORI SADIKPUR WSS
Village Covered
1
Original Scheme Year
2009
Amount (Lakh)
172.46
Retrofitting Year
2020
Amount (Lakh)
234.56
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting, Baundrywall repairing
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
22078
Pipe Line (Replacement)
0
FHTC Existing
731
FHTC Repair
144
FHTC New
413
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 0 km with respect to the requirement of 22.08 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 11.32 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 731 with respect to the required 1144 Household as per the present OMIL survey out of 1144 FHTC, 144 FHTC are damaged condition need to repair. also, no of 413 new HSC is required to the fully functional.
