Brief Description of Works

District Unnao
Scheme ID 4827789
Scheme Name Bhawaliya Pahasa Re-Organisation scheme
Village Covered 8
Original Scheme Year 2013
Amount (Lakh) 495.46
Retrofitting Year 2020
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 3
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 3
Pipe Line (New) 19583
Pipe Line (Replacement) 5445
FHTC Existing 1185
FHTC Repair 734
FHTC New 749
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 39.96 km with respect to the requirement of 59.55 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 3.03 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 1185 with respect to the required 1934 Household as per the present OMIL survey out of 1934 FHTC, 734 FHTC are damaged condition need to repair. also, no of 749 new HSC is required to the fully functional. 4. Two Zones and 03 OHT, 17 no Habitations, Base year population 15782