District Unnao
Scheme ID 4827933
Scheme Name Mawai water supply scheme
Village Covered 1
Original Scheme Year 2014
Amount (Lakh) 742.00
Retrofitting Year 2020
Amount (Lakh) 195.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. 2.03 lac (Plaster & painting, Repairing of wicket gate)
Pump House (New) 0
Pump House (Repair) 3
Pipe Line (New) 29553
Pipe Line (Replacement) 4310
FHTC Existing 1902
FHTC Repair 1364
FHTC New 548
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. FRU unit required to provide portable water 2. Total existing pipeline of scheme 44.32 km with respect to the requirement of 78.18 km as per present survey of OMIL to make the scheme fully functional. 3. Road dismantling & restoration of the 6.1 km required for pipe laying & new HSC. 4. Total existing FHTC found at site 1902 with respect to the required 2450 House hold as per the present OMIL survey out of 1902 FHTC, 1364 FHTC are damaged condition need to repair. also, no of 458 new HSC is required to the fully functional. 5. Mawai 2011 census population 14690 at present for year 2025 is 18353. 6. 03 No Tubewll and 850 KL OHT, 22 No Habitation, mini line damaged due to construction of road