Brief Description of Works
District
Raebareli
Scheme ID
484140
Scheme Name
SAMRI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
2014
Amount (Lakh)
266.08
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
1
New OHT
1
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
1
Pump House (Repair)
2
Pipe Line (New)
9423
Pipe Line (Replacement)
3531
FHTC Existing
684
FHTC Repair
564
FHTC New
648
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1- This is a Non-functional Scheme. In this village there is 1 Revenue village & 15 habitations. Pali Kheda habitations of scheme pipe line is not laid in original scheme. This habitation is across the railway line, Second tubewell of scheme is 1.3 KM away from exsiting OHT & before the railway line, 1 new zone proposed as a sub-zone for these habitation of Semari water supply scheme. Existing pipe material in this scheme is HDPE.
2- We have proposed 12.954 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision of 40 m Railway crossing.
4- Provision for construction of 1 new tubewell du