Brief Description of Works
District
Raebareli
Scheme ID
484155
Scheme Name
UTTARA GAURI GRAM PANCHAYAT RURAL WATER SUPPLY SCH
Village Covered
1
Original Scheme Year
2009
Amount (Lakh)
124.00
Retrofitting Year
2020
Amount (Lakh)
83.72
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
2749
Pipe Line (Replacement)
4083
FHTC Existing
513
FHTC Repair
427
FHTC New
357
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 6 habitations. 1 existing tubewell (grid based). Existing pipe material in this scheme is PVC.
2- We have proposed 6.832 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of 1 new tubewell due to existing defunct tubewell.
4- Provision for construction of 357 new house connection due to increase of population & pending house hold, provision for repairing of 427 existing house connection due to damaged or non-functional.
5- Repairing of boundary wall such as dismantling of damaged plas