Brief Description of Works

District Raebareli
Scheme ID 484247
Scheme Name BAHAI PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered 1
Original Scheme Year 2010
Amount (Lakh) 214.95
Retrofitting Year 2020
Amount (Lakh) 91.80
New T/W 2
Rebore T/W 0
New OHT 1
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 2
Pump House (Repair) 1
Pipe Line (New) 15221
Pipe Line (Replacement) 15275
FHTC Existing 1073
FHTC Repair 945
FHTC New 1108
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 16 habitations. 2 existing tubewell, both are grid based tubewell (1 tubewell defunct). Existing pipe material in this scheme is PVC. 1 new zone proposed as a sub-zone for these habitation of Bahai water supply scheme. . 2- We have proposed 30.496 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design. 3- Provision of 30 m State highway crossing. 4- Provision for construction of new tubewell due to existing defunct tubewell. 5- Provision for construction of 1108 new house connection due to increase of population & pend