Brief Description of Works
District
Raebareli
Scheme ID
484259
Scheme Name
KANDAWAN PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
0.00
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
3320
Pipe Line (Replacement)
1271
FHTC Existing
582
FHTC Repair
506
FHTC New
240
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
1- This is a Partial-functional scheme. In this scheme there is 1 revenue village & 4 habitations. 1 existing tubewell (grid power).
2- We have proposed 4.591 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of new tubewell due to existing defunct tubewell.
4- Provision for construction of 240 new house connection due to increase of population & pending house hold, provision for repairing of 506 existing house connection due to damaged or non-functional.
5- Repairing of boundary wall such as dismantling of damaged plaster/brick work & reconstruction of plaster &