Brief Description of Works
District
Raebareli
Scheme ID
484262
Scheme Name
SIDHAUNA PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
2015
Amount (Lakh)
286.66
Retrofitting Year
2020
Amount (Lakh)
108.36
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
6580
Pipe Line (Replacement)
10057
FHTC Existing
1195
FHTC Repair
500
FHTC New
717
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 16 habitations. 1 existing tubewell (grid power).
2- We have proposed 16637 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision of 25 m State highway crossing.
4- Provision for construction of 717 new house connection due to increase of population & pending house hold, provision for repairing of 500 existing house connection due to damaged or non-functional.
5- Repairing of existing boundary wall such as dismantling of damaged plaster/brick work & reconstruction of plaster & brick work. Also painting &