Brief Description of Works
District
Raebareli
Scheme ID
4843234
Scheme Name
DIGHIYA WATER SUPPLY SCHEME
Village Covered
3
Original Scheme Year
2010
Amount (Lakh)
118.50
Retrofitting Year
2020
Amount (Lakh)
70.51
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
1865
Pipe Line (Replacement)
2083
FHTC Existing
218
FHTC Repair
196
FHTC New
204
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
1- This is a Partial-functional scheme. In this scheme there is 3 revenue village & 5 habitations. 1 existing tubewell (grid based).
2- We have proposed 3.948 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of 1 new tubewell due to existing defunct tubewell.
4- Provision for construction of 240 new house connection due to increase of population & pending house hold, provision for repairing of 196 existing house connection due to damaged or non-functional.
5- Repairing of boundary wall such as dismantling of damaged plaster/brick work & reconstruction of plaste