Brief Description of Works

District Kannauj
Scheme ID 4861678
Scheme Name Sarontop Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 196.43
Retrofitting Year 0
Amount (Lakh) 92.10
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2016 & COVERS ONE HABITATION. HOWEVER AS PER THE PARTIAL SCHEME, REGULAR WATER SUPPLY IS RUNNING ONLY IN HALF VILLAGE . DURING CONSTRUCTION, A DI PIPE(2008MTR) & GI PIPE MEDIUM CLASS (6240MTR) WAS USED, IN WHICH GI PIPE & DI PIPE ARE NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 8248 MTR BTUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 1753 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 1753 AND REPAIR APPROX 2395 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 82 NEW HOUSE CONNECTIONS. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS OL