Brief Description of Works

District Kannauj
Scheme ID 4865996
Scheme Name Gowa
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 93.13
Retrofitting Year 0
Amount (Lakh) 36.12
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSRUCTED IN 2011-12. IN THE EXISTING SCHEME A 4 KG PVC PIPE LINE 4391 METER PIPE LINE WAS LAID. OVER THE TIME PIPE LINE HAS SUFFERED DAMAGE IN CERTAIN LOCATION DUE TO RAD WIDENIN.WHILE IN OTHER AREA PIPE LINE WAS CHOKE/BLOCKAGE AS PER NEW SURVEY THE PRESENT SCHEME COVER 7 KM NETOWRK THEREFORE WE ARE PROPOSED 2933 METERS NEW LINE. IN NEW HOUSE HOLD 86 NEW HOUSE CONNECTON IS CONSIDERED & 127 CONNECTON NEED TO REPAIR BECAUSE AT CURRENT THE GI PIPES & TAPS ARE MISSING.SOME REPAIR WORK IS ALOS REQUIRED FOR THE BOUNDARY WALL AND OHT. ONSTRUCTED OF NEW PUMP HOUSE FOR NEW BORE.THE BOREWELL PUMP IS CURRENTLY RUNNING BUT HAS ALREADY BEEN REPAIRED TWICE, SO WE HAVE CONSIDER THE PROVISION OF A SPARE PUMP.