Brief Description of Works

District Kannauj
Scheme ID 4866494
Scheme Name Neknampur Water Supply Scheme
Village Covered 2
Original Scheme Year 0
Amount (Lakh) 118.59
Retrofitting Year 0
Amount (Lakh) 30.97
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Fully Functional > 20 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN YEAR 2017 & COVERS 4 HABITATION. THE SCHEME IS CONSIDERED AS A FULLY FUNCTIONAL SCHEME.DURING CONSTRUCTION,6KG PVC PIPES WAS USED, IN WHICH ALMOST PVC PIPES ARE DAMAGED BECAUSE OF CONSTRUCTION WORK OF DIFFERENT DEPARTMENT. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 6972 MTR BTUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 2082 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 2082 AND REPAIR APPROX 40% OF THE DAMAGED EXISTING NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 82 NEW HOUSE CONNECTIONS & 248 REPAIR. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SOME REPAIR WORK IS ALSO REQUIRED FO