Brief Description of Works

District Kannauj
Scheme ID 4866497
Scheme Name Induiyaganj Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 121.47
Retrofitting Year 0
Amount (Lakh) 49.95
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2015 & COVERS 6 HABITATION. HOWEVER AS PER THE PARTIALLY FUNCTIONAL SCHEME, REGULAR WATER SUPPLY IS NOT RUNNING IN VILLAGE. DURING CONSTRUCTION, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 13270 MTR(HDPE PIPE) BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 5690 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 5690 AND REPAIR APPROX 8760 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 174 NEW HOUSE CONNECTIONS & 179 REPAIRING FHTC. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS OLD, IN OHT SEEPAGE IN CYLINDRICAL WALL & BOTTOM DOME ARE FOUND SO WATER PR