District
Kannauj
Scheme ID
4866525
Scheme Name
TERA JAKET
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
307.66
Retrofitting Year
0
Amount (Lakh)
88.39
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THIS SCHEME BASE YEAR IS 2016, COVERING 1 REVENUE VILLAGE & 5 HABITATION. THIS SCHEME IS CONDERED AS NON FUNCTIONAL SCHEME. IN THIS SCHEME HDPE PIPE WAS USED DURING CONSTRUCTION HAVING TOTAL LENGTH 14683 METER,We will only consider the old network 11405 mtr. The other network was damaged during new road and drain (nali) construction. The remaining pipes do not match with the new network . If using the existing network, we will only repair leaks, carry out joint repairs, replace/ extend some pipes, and house connections based on current demand. However, if a new distribution network is designed, it will be planned based on the projected demand for the ultimate year,, starting from the current year. IN WHICH NETWORK IS PROPOSED HAVING LENGTH 7148 METER. OLD FHTCS ARE ALMOST DAMAGED AND SOM