Brief Description of Works
District
Kannauj
Scheme ID
4866544
Scheme Name
DUNDWA BUZURG WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
213.80
Retrofitting Year
0
Amount (Lakh)
179.17
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THE SCHEME WAS CONSTRUCTED IN 2011 & COVERS 3 HABITATION. HOWEVER AS PER THE NON FUNCTIONAL SCHEME, DURING CONSTRUCTION, A 4 KG PVC PIPE WAS USED, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 30014 METER, BUT SOME AREAS WERE FOUND MISSING & DAMAGED IN THE EARLIER RECORDS. IN WHICH 4629 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 4629 AND REPAIR APPROX 25385 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 350 NEW HOUSE CONNECTIONS & 689 REPAIR. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. THERE ARE 3 PUMP HOUSE IN THE SCHEME ALL ARE TOTALLY DAMAGED SO 3 NEW PH & TW IS CONSIDERED. IN OHT SEEPAGE IN CYLINDRICAL WALL
