Brief Description of Works

District Kannauj
Scheme ID 4866572
Scheme Name MIRGAWAN WATER SUPPLY SCHEME
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 245.13
Retrofitting Year 0
Amount (Lakh) 99.40
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THIS SCHEME IS CONSTRUCTED IN 2016 COVERED 3 HABITATION. THIS SCHEME IS CONSIDERED AS A PARTIALLY FUNCTIONAL SCHEME IN THIS SCHEME 6 KG PVC WERE USED IN DISTRIBUTION NETWORK HAVING LENGTH 11641 METER. AS NETWORK ARE DAMAGED, WE ARE CONSIDERING ONLY 9461 MTR WE WILL ONLY REPAIR LEAKS, CARRY OUT JOINT, REPLACE/EXTEND PIPES. 978 METER OF NEW LINE HAVE BEEN PROPOSED TO START REGULAR WATER SUPPLY TO EVERY HOUSE HOLD & 95 NEW FHTC ARE ALSO PROPOSED FOR NEWLY CONSTRUCTED HOUSE HOLD & 470 REPAIRING FHTC. TW CONDITION IS OK & PUMP HOUSE NEEDS REPAIR , CONDITION OF OHT IS ALSO VERY BAD MANY SEEPAGE ARE FOUND IN THE OHT SO WE CONSIDERED WATER PROOFING & PAINTING WORK AS WELL. BOUNDARY WALL IS CRACKED & BROKEN NEED MAJOR REPAIR WORK. ROAD RESTORATION IS ALSO NEEDED.