Scheme Name SATWARI WATER SUPPLY SCHEME
Village Covered 2
Original Scheme Year 0
Amount (Lakh) 75.28
Retrofitting Year 0
Amount (Lakh) 19.76
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Non-Functional > 100 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2015 & COVERS THREE HABITATION. HOWEVER AS PER THE NON FUNCTIONAL SCHEME, REGULAR WATER SUPPLY IS NOT RUNNING IN VILLAGE. DURING CONSTRUCTION, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 4082 MTR(6 KG PVC PIPE) BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 3687 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 930 MTR AND REPAIR APPROX 1325 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 85 NEW HOUSE CONNECTIONS ALSO 117 FHTC TO BE REPAIRING. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS OLD, SOME REPAIR WORK IS ALSO REQUIRED FOR THE PUMP & IN OHT SE