Brief Description of Works
District
Kannauj
Scheme ID
4866948
Scheme Name
Haraipur Water Supply Scheme
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
81.45
Retrofitting Year
0
Amount (Lakh)
116.52
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THE SCHEME COVERS 12 HABITATION. REGULAR WATER SUPPLY IS RUNNING ONLY IN 7 HABITATION . DURING CONSTRUCTION, A 4 KG PVC WAS USED. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 25932 MTR BUT SOME AREAS WERE FOUND MISSING & DAMAGED IN THE EARLIER RECORDS. IN WHICH 10873 METER NEW LINE IS PROPOSED.REPAIR APPROX 15059 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING,DAMAGED. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 342 NEW HOUSE CONNECTIONS & 974 REPAIR. 5 HABITATION OUT OF 12 SUFFERING FROM WATER SUPPLY DUE TO LONG DISTANCE & CANAL EXPRESSWAY & RAILWAY CROSSING, SO WE HAVE TO CONSIDERED A SEPERATE SCHEME FOR THE SAME HABITATION. WE HAVE TAKEN NEW TW,OHT,PH SOME PIPELINE & FHTC FOR THIS SCHEME MENTIONED ABOVE.