Brief Description of Works
District
Sultanpur
Scheme ID
5051119
Scheme Name
Baraunsa
Village Covered
4
Original Scheme Year
2014
Amount (Lakh)
0.00
Retrofitting Year
2021
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
2
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
2
Pipe Line (New)
25993
Pipe Line (Replacement)
11000
FHTC Existing
250
FHTC Repair
120
FHTC New
1214
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
As per the recent assessment of on-site conditions, approximately 15.4 km of 4 kg/cm² PVC pipeline was originally laid during the initial implementation phase (2011–11) to provide piped water supply coverage to Four village and Seventeen habitations under a stand post-based design. During retrofitting works in 2020–21, an additional 4.9 km of 6 kg/cm² PVC pipeline, with diameters ranging from 63 mm to 110 mm—including 4.4 km of 63 mm pipeline—was laid to enhance system performance. However, the overall network length remained constrained due to the original design’s focus on stand posts, which lacked adequate provision for household-level distribution. With the transition to the Functional Household Tap Connection (FHTC) model, the revised design now mandates individual tap connections for