Brief Description of Works

District Sultanpur
Scheme ID 5055327
Scheme Name Kareban
Village Covered 3
Original Scheme Year 2015
Amount (Lakh) 0.00
Retrofitting Year 0
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 2
Pipe Line (New) 13677
Pipe Line (Replacement) 5300
FHTC Existing 228
FHTC Repair 130
FHTC New 320
Status Non-Functional > 100 lacs
Specific reason for increasing cost The original water supply scheme was constructed during the financial year 2014–15. However, based on current site conditions, the scheme has remained non-functional for the past 2 years, primarily due to the severely deteriorated condition of the existing pipeline infrastructure. During the initial phase of implementation, approximately 10 km of 4 kg/cm² PVC pipeline was laid. While this was adequate at the time, the design significantly limited the reach and effectiveness of the distribution system and failed to meet the long-term service requirements of the village. As per the current design and demand assessment, it has been observed that the diameter of all main pipelines does not match the required specifications. The existing pipeline dimensions are inadequate, contributing to frequ