Brief Description of Works

District Sultanpur
Scheme ID 5056772
Scheme Name Belhari
Village Covered 1
Original Scheme Year 2014
Amount (Lakh) 0.00
Retrofitting Year 2021
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 2
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 2
Pipe Line (New) 28864
Pipe Line (Replacement) 21000
FHTC Existing 200
FHTC Repair 110
FHTC New 1328
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. The original scheme was constructed during the year 2013-14. 1.As per the recent assessment of on-site conditions, approximately 23.6 km of 4 kg/cm² PVC pipeline was originally laid during the initial implementation phase (2010–11) to provide piped water supply coverage to one village and 15 habitations under a stand post-based design. During retrofitting works in 2020–21, an additional 2.9 km of 6 kg/cm² PVC pipeline (with diameters ranging from 63 mm to 110 mm) was laid, including 2.9 km of 63 mm PVC pipeline to improve system performance. However, the overall network length remained limited due to the original design being focused on stand posts, without adequate provision for household-level distribution. With the shift towards the Functional Household Tap Connection (FHTC) model, t