Brief Description of Works

District Sultanpur
Scheme ID 5056876
Scheme Name Ratanpur & Vallipur
Village Covered 2
Original Scheme Year 2016
Amount (Lakh) 0.00
Retrofitting Year 0
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 1
New OHT 1
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 2
Pipe Line (New) 8367
Pipe Line (Replacement) 5000
FHTC Existing 300
FHTC Repair 150
FHTC New 518
Status Non-Functional > 100 lacs
Specific reason for increasing cost The original water supply scheme was constructed during the year 2015–16, based on the demand and infrastructure requirements prevailing at that time. As per the current layout, the scheme is divided into two zones to facilitate effective water distribution. However, during the initial implementation phase, only one Elevated Storage Reservoir (ESR) was constructed at the Zone-1 location. In contrast, Zone-2 has been receiving water supply directly from the tube well, without any intermediate storage or pressure regulation. This direct supply system in Zone-2 has led to uneven water distribution, pressure fluctuations, and inadequate service coverage, particularly during peak demand periods. The absence of a dedicated ESR in Zone-2 has also restricted the ability to manage water storage and